1.
Front Range Power Project
Location: Fountain
Cost: $257 million
General Contractor: TIC - The Industrial Co
Architect:
Start Date: February 2001
Completion Date: June 2003
480 mw combined cycle power plant.
Top
2. Union Plaza
Location: Denver
Cost: $107 million
General Contractor: Hensel Phelps Construction Co
Architect: Weber-Thompson
Start Date: April 2001
Completion Date: August 2003
The office tower has seven floors, each of which has approximately
16,000 sq ft of rental space.
Top
3. Anschutz Inpatient Pavilion
Location: Aurora
Cost: $95 million
General Contractor: Haselden Construction
Architect: H+L Architecture; HDR Architects
Start Date: November 2001
Completion Date: December 2003
Part of the Anschutz Centers for Advanced Medicine, this steel frame
structure with a masonry skin will total 13 stories plus a basement. The
first phase of the project will consist of 101 inpatient beds, three nursing
units, obstetrics, emergency, surgery and radiology departments, an intensive
care unit, a dietary department, a clinical laboratory and other support
departments.
Top
4. Sky Ridge Medical Center
Location: Lone Tree
Cost: $84 million
General Contractor: Bovis Lend Lease Inc
Architect: Gresham Smith & Partners
Start Date: October 2001
Completion Date: June 2003
Construction of a new, 362,000-sq-ft, eight-story, 106-private-room
Level III Emergency/Trauma hospital with obstetrical services and Level
II nursery, full diagnostic and imaging services, cardiac services, cancer
center, and a Broncos Sports Medicine/Rehabilitation Center. Special features
include nine amenity suites, healing garden and other extensive outdoor
patios and gardens, patient/family medical library, business center for
visitors, spiral staircase and fireplace in lobby.
Top
5. Aurora Municipal Center
Location: Aurora
Cost: $70 million
General Contractor: The Weitz Company
Architect: Barber Architecture Corp
Start Date: September 2001
Completion Date: February 2003
The design-build project consisted of a five-story, 295,000-sq-ft city
hall that consolidated 28 separate departments from various buildings
throughout the city. The interior of the building includes a TV broadcast
studio, cafe, council chambers and a 8,000-sq-ft lobby. Attached to the
building is a 780-car parking garage and there are also 550 surface parking
spaces.
All of the existing utilities were resized and relocated to accommodate
the new building and garage. a great lawn adorned with public art finish
surround the building and tie together the other three buildings on the
site.
Top
6. Parker Adventist Hospital
Location: Parker
Cost: $60 million
General Contractor: Kitchell Contractors & GE Johnson Construction
(JV)
Architect: HKS Inc
Start Date: Spring 2002
Completion Date: Fall 2003
A 206,000-sq-ft, 100-bed hospital that will include Level II Trauma
Center, surgical suites, women's and children's services, diagnostic and
imaging services, cardiac services with catheterization labs.
Top
7. Boulder Community Hospital
- Foothills Campus
Location: Boulder
Cost: $54 million
General Contractor: Gerald H Phipps Inc
Architect: OZ Architecture & Boulder Associates
Start Date: August 2001
Completion Date: June 2003
New 45-bed hospital and medical office building. Hospital includes
emergency, radiology, surgery and women's departments.
Top
8. CH2M Hill Headquarters
Location: Englewood
Cost: $54 million
General Contractor: The Weitz Co
Architect: Barber Architecture (core/shell); Acquilano Leslie (TI);
IDC (TI)
Start Date: September 2001
Completion Date: December 2002
This is a campus development for a large engineering firm. The 25-acre
site has the infrastructure developed for a total of five buildings, with
three of the buildings completed at this time. There are 390,000 sq ft
of developed office space with a commercial kitchen and a large data center.
The entire project followed "green building" guidelines and
meets LEEDS certification.
Top
9. University of Denver College
of Law
Location: Denver
Cost: $48.03 million
General Contractor: Saunders Construction Inc
Architect: H+L Architecture
Start Date: July 2001
Completion Date: September 2003
The new $48 million, 245,000-sq-ft facility will house the University's
Law School Library, 15 state-of-the-art classrooms, a 120-seat lecture
hall, 31 meeting/break-out rooms, and underground and structured parking
for 850 vehicles. Construction on the four-story, cast-in-place concrete
structure is well under way in the heart of DU's busy campus. The building's
architecture incorporates the university's signature copper roof, red
brick and limestone features, as well as distinctive interior finishes
including oak and quarry tile flooring.
Top
10. Williams Village Student
Housing Expansion
Location: Boulder
Cost: $48 million
General Contractor: Swinerton Builders
Architect: OZ Architecture
Start Date: June 2002
Completion Date: December 2003
Two six-story student housing apartments with 925 beds.
Top
11. Cherry Creek High School
6
Location: Arapahoe County
Cost: $47 million
General Contractor: JHL Constructors Inc
Architect: H+L/LKA joint venture
Start Date: July 2001
Completion Date: July 2003
$47 million high school, 120-acre site, 362,000-sq-ft, with two gyms,
a theatre, an aquatic facility and 640 rooms.
Top
12. Larimer County Fairgrounds
Location: Loveland
Cost: $45 million
General Contractor: The Neenan Co
Architect: Bullock Smith & Partners Inc; PBK Architects Inc;
Kenney & Associates LLC
Start Date: April 2002
Completion Date: October 2003
This is a 240,000-acre, 500,000-sq-ft, multi-phased project. Phase
One includes 376,000 sq ft in five buildings, the largest being the 162,000-sq-ft
events center, future home of the Colorado Eagles CHL expansion team.
Top
13. Denver Federal Center Renovation,
GSA Building #25
Location: Denver
Cost: $44.2 million
General Contractor: Dunn/BDI
Architect: OZ Architecture
Start Date: January 2000
Completion Date: July 2003
Construction requirements include: demolition of existing interior
and exterior elements; phased asbestos abatement; lead and other remediation;
minor excavation and grading; landscaping and irrigation; site furnishings;
concrete replacement; new concrete; masonry; structural steel and miscellaneous
metals; rough and finish carpentry; millwork; roofing and sheet metal;
doors-frames-hardware; glass and glazing; window replacement; metal framing
and drywall; interior finishes; casework; lab equipment; specialties and
furnishings; elevators.
Top
14. East Folsom Stadium Improvements
Location: Boulder
Cost: $42 million
General Contractor: Turner/Shaw (JV)
Architect: Sink Combs Dethlefs
Start Date: April 2002
Completion Date: August 2003
The contract called for the addition of 2,000 club seats and 41 luxury
suites to the east side of Folsom Stadium at the University of Colorado
at Boulder.
Top
15. PVHS Lemay Campus Addition
& Renovation
Location: Fort Collins
Cost: $40.5 million
General Contractor: MA Mortenson Co
Architect: Davis Partnership Architects
Start Date: March 2000
Completion Date: November 2003
Phase 3: Birthing Center and Special Nursery
Top
16. Denver Health & Hospital
- Western Addition
Location: Denver
Cost: $40 million
General Contractor: Gerald H Phipps Inc
Architect: Lantz-Bozzio Architects; Kaplan McLaughlin Diaz Architects
Start Date: August 2001
Completion Date: July 2003
Four-story addition including a Colorado Corrections Medical Facility
and patient rooms. Central plant expansion.
Top
17. Ballpark Lofts
Location: Denver
Cost: $37.57 million
General Contractor: JE Dunn Construction Company
Architect: Davis Partnership
Start Date: May 2001
Completion Date: April 2003
Ballpark Lofts is a 390,334-sq-ft, five- and six-story, 355-unit apartment
building with a seven-story parking garage. The building occupies a full
downtown block. It incorporates a concrete frame with an exterior of brick
block and sheet metal. Interior finishes include exposed concrete floors
and decks, wood flooring and upscale kitchen cabinetry with granite counters.
Top
18. The Metro
Location: Denver
Cost: $37.55 million
General Contractor: CFC Construction
Architect: Kaufman Meeks & Partners
Start Date: December 2001
Completion Date: September 2003
415 market-rate-rental urban apartments.
Top
19. Aspen High School
Location: Aspen
Cost: $33 million
General Contractor: GE Johnson Construction
Architect: Bennett Wagner Grody
Start Date: June 2001
Completion Date: February 2003
New additions totaling 113,700-sq-ft with 18 new classrooms, offices,
library, theater, weight room, locker rooms and gym with elevated running
track, 128-seat lecture hall with projection and sound system. Renovation
of 62,500 sq ft of original "pod" design.
Top
20. UNC Ross Hall Chemistry
Bldg Addition & Renovation
Location: Greeley
Cost: $31 million
General Contractor: Adolfson & Peterson Construction
Architect: Christopher Carvell Architects
Start Date: January 2001
Completion Date: June 2003
Phase 1 expansion - 101,000-sq-ft, four-story addition of classrooms,
labs with specialized chemistry equipment, two 100-seat lecture halls.
Phase 2 - Gut and remodel of 115,000-sq-ft, four-story building. Features
a two-story atrium/clerestory.
Top
22. Standley Lake Dam Rehabilitation
Location: Westminster
Cost: $30.64 million
General Contractor: ASI RCC Inc
Architect:
Start Date: July 2002
Completion Date: November 2004
Twin 72" diameter microtunnel wet taps in existing reservoir.
Construction of two underwater intakes, a 35-ft diameter reinforced concrete
valve shaft 100-ft deep, new spillway with concrete labyrinth weir and
multiple drop structures includes 28,000 cu yd of RCC and 7,500 cu yd
conventional concrete.
Top
23. Buffalo Ridge
Location: Avon
Cost: $22.48 million
General Contractor: CFC Construction
Architect: Eric Smith Associates PC
Start Date: June 2002
Completion Date: October 2003
244 affordable apartments in the mountain region.
Top
24. Larimer County Courthouse
Office Building
Location: Fort Collins
Cost: $22.1 million
General Contractor: Merit Electric; Western States Mechanical
Architect: Fentress Bradburn Architects
Start Date: February 2002
Completion Date: August 2003
The Larimer County Courthouse Office is a new four-story, 124,000-sq-ft
building housing Larimer County's Assessor, Board of County Commissioners,
County Clerk, Information Management Services, Natural Resources, Planning
and Building, Public Works, Treasurer and Veteran Services departments.
The new building is located on the same site as the previous County Courthouse.
The Hensel Phelps/Fentress Bradburn Architects design-build team was selected
through 'Best Value' procurement for the design solution that maximizes
efficiency and program functionality.
Top
25. Rock Canyon High School
(Douglas County HS #7)
Location: SE Highlands Ranch
Cost: $21.5 million
General Contractor: Haselden Construction
Architect: H+L Architecture; LKA Partners
Start Date: July 2002
Completion Date: July 2003
Douglas County's newest high school, this two-story facility will include
gymnasiums and associated locker rooms, a cafeteria and dining facilities
and a 600-seat auditorium. The project also includes tennis courts, baseball,
football and t
rack fields.
Top
26. SBIRS Mission Control Backup
Facility
Location: Colorado Springs
Cost: $20 million
General Contractor: Swinerton Builders
Architect: US Army Corps of Engineers
Start Date: June 2002
Completion Date: September 2003
52,000-sq-ft high-tech and security building.
Top
27. Stapleton Town Center
Location: Denver
Cost: $18.3 million
General Contractor: Saunders Construction Inc
Architect: Urban Design Group
Start Date: September 2002
Completion Date: November 2003
This 16-acre site is the first large multi-use redevelopment being
built at the old Stapleton Airport. It consists of eight buildings totaling
200,000 sq ft. These buildings will include 66 residential apartments,
40 retail spaces, two 30,000-sq-ft office buildings, two stand-alone restaurants
and a King Soopers. All of the buildings are radiused around the roundabout
on the property line and are structural steel slab on metal deck, with
the exception of the residential apartments that will be stick-framed.
The project is scheduled to be complete in November 2003.
Top
28. Shadow Ridge Middle School
Location: Thornton
Cost: $17.8 million
General Contractor: Adolfson & Peterson Construction
Architect: Klipp Colussy Jenks DuBois
Start Date: March 2002
Completion Date: July 2003
New 149,930-sq-ft middle school with gymnasium, cafetorium, library/media
center, eight-lane competition track and six tennis courts.
Top
29. Aspen Rec Center/Iselin
Ice Arena
Location: Aspen
Cost: $17 million
General Contractor: Shaw
Architect: Harry Teague
Start Date: Spring 2002
Completion Date: March 2003
The project is a 81,800-sq-ft community center, including an NHL-size
ice arena, a six-lane, 25-yd swimming pool and a 130-ft water slide.
Top
30. Swedish Medical Center
Location: Englewood
Cost: $16.6 million
General Contractor: Bovis Lend Lease Inc
Architect: Gould Turner Group PC
Start Date: May 2001
Completion Date: May 2003
This CM/GC project includes an 8,200-sq-ft renovation/interior build-out
of 10 ICU's and a 53,000-sq-ft OR addition and renovation that includes
a pharmacy, soiled utility, lockers, lounge, PACU and Pre-Op. Also complete
architectural finish upgrades to four existing OR rooms.
Top
31. The Ridge Recreation Center
at West Meadows Recreation Campus
Location: Littleton
Cost: $16.6 million
General Contractor: Pinkard Construction Co
Architect: Barker Rinker Seacat
Start Date: January 2002
Completion Date: June 2003
The 83,210-sq-ft, two-story, masonry, steel and glass curtain wall
structure includes a gymnasium, two racquetball courts, two locker rooms
with separate family locker rooms, indoor climbing wall, family leisure
pool and slide, lap and therapy pools, indoor playground, elevated running
track, classrooms, craft rooms, dance/aerobic facilities and office/conference
rooms.
Top
32. Sky Ridge Medical Office
Building 1 & Tenant Finish
Location: Lone Tree
Cost: $16 million
General Contractor: Calcon Constructors Inc
Architect: Davis Partnership PC
Start Date: April 2002
Completion Date: July 2003
New 125,000-sq-ft medical office building attached via a four floor
pedestrian bridge to Sky Ridge Medical Center.
Top
33. Logan County Justice Center
Location: Sterling
Cost: $15.9 million
General Contractor: FCI Constructors Inc
Architect: Reilly Johnson Architecture
Start Date: March 2002
Completion Date: May 2003
98,000-sq-ft facility, including courtrooms, probation offices, coroner,
sheriff's administration, 108-bed detention and a garage on 16.9 acre
site.
Top
34. Lakeshore Athletic Club
at FlatIron
Location: Broomfield
Cost: $15.5 million
General Contractor: Pinkard Construction Co
Architect: Ohlson Lavoie Corporation
Start Date: August 2002
Completion Date: November 2003
The 84,350-sq-ft, high-end, full-service athletic/recreation facility
includes a gymnasium, roof-top tennis courts, indoor and outdoor pools,
full-service spa, climbing wall, children's gym, childcare center, full
service kitchen with deli area, weight room, cardio decks and open fitness
rooms.
Top
35. GE Blue Spruce
Location: Aurora
Cost: $15.1 million
General Contractor: TIC - The Industrial Co
Architect:
Start Date: June 2002
Completion Date: February 2003
A dual fuel simple cycle facility gas turbine project, utilizing (2)
GE 7FA CT's.
Top
36. South Denver Cardiology
Associates, Heart Center
Location: Littleton
Cost: $14 million
General Contractor: Calcon Constructors Inc
Architect: Davis Partnership PC
Start Date: April 2002
Completion Date: June 2003
New 68,000-sq-ft medical building containing diagnostics, clinical,
rehabilitation, wellness, cath lab, MRI and CT scan.
Top
37. Northern Colorado Water
Conservancy District Campus
Location: Berthoud
Cost: $12.8 million
General Contractor: FCI Constructors Inc
Architect: RB+B Architects
Start Date: April 2002
Completion Date: June 2003
New 45,000-sq-ft office building; 33,600-sq-ft maintenance building;
and three new storage buildings totaling 18,000 sq ft. On a 19 acre site.
Top
38. Curtis Park Phase 2
Location: Denver
Cost: $12.2 million
General Contractor: Milender White Construction Co
Architect: Humphries Poli Architects PC
Start Date: April 2002
Completion Date: May 2003
The project involves the construction of 125 apartments within 45 separate
buildings. In addition to the buildings, complete infrastructure is also
included.
Top
39. Our Lady of Loreto Catholic
Parish
Location: Foxfield
Cost: $12 million
General Contractor: JHL Constructors Inc
Architect: David Owen Tryba
Start Date: August 2001
Completion Date: April 2003
$12 million new Catholic parish facility
Top
40. Walmart Supercenter #5051
Location: Greeley
Cost: $11.25 million
General Contractor: Roche Constructors Inc
Architect: CLC Associates Inc
Start Date: July 2002
Completion Date: March 2003
A 23-acre store and sitework project; 212,786 sq ft.
Top
41. Saddle Rock Marketplace
Location: Aurora
Cost: $11.1 million
General Contractor: WE O'Neil Construction Company of Colorado
Architect: CLC Associates; Peterson Staggs Architects
Start Date: September 2002
Completion Date: May 2003
The project includes 70,000 sq ft of new retail shops in five buildings,
plus a new 58,000-sq-ft Albertson's grocery store with 40 acres of site
and utility work.
Top
42. Metro High Solids Centrifuges
and Cake Storage Improvements
Location: Denver
Cost: $10.6 million
General Contractor: Western Summit Constructors Inc
Architect:
Start Date: June 2002
Completion Date: August 2003
The project involved construction of a new four-story dewatered sludge
facility; renovation of the existing dewatered sludge facility; renovation
of three sludge holding tank pump stations and one centrate pumping station;
renovation of the sludge processing building; the installation of four
new high-solids centrifuges procured by the owner; renovation to the belt
conveyor system; and renovation to the electrical, HVAC, plumbing and
hydronic systems.
Top
43. Good Samaritan Village Estes
Park
Location: Estes Park
Cost: $10.5 million
General Contractor: Alliance Construction Solutions LLC
Architect: Basis Architecture PC
Start Date: June 2002
Completion Date: August 2003
An assisted and independent living facility consisting of two buildings.
The assisted facility is 25,200 sq ft and the independent facility is
70,000 sq ft.
Top
44. Edwards Corner
Location: Edwards
Cost: $10.5 million
General Contractor: WE O'Neil Construction Company of Colorado
Architect: Geis Architects
Start Date: January 2003
Completion Date: October 2003
The three-level, 94,000 sq ft mixed-use project has office over retail
above underground parking. Negotiated GMP format.
Top
45. Isbell Lofts
Location: Denver
Cost: $9.98 million
General Contractor: Milender White Construction Co
Architect: Parkhill-Ivins
Start Date: February 2001
Completion Date: April 2003
The project consists of the renovation and expansion of the Isbell
Kent Oakes Dry Goods Co. into a 37-unit loft project in downtown Denver.
A two-story penthouse addition along with a two-level parking structure
is also included.
Top
46. Daniels Fund Building
Location: Denver
Cost: $9.6 million
General Contractor: Skanska USA Building Inc
Architect: Michael Knorr & Associates
Start Date: May 2002
Completion Date: August 2003
A three-story, 57,000-sq-ft office building with a 68-car underground
parking garage.
Top
47. Centerpark Industrial Center
Buildings A & B
Location: Denver
Cost: $9.5 million
General Contractor: DSP Builders Inc
Architect: Intergroup Inc
Start Date: December 2002
Completion Date: December 2003
Two one-story, tilt-up concrete buildings to be used for manufacturing/distribution.
Two additional buildings will be completed in 2004 for a total of four
buildings. Work includes demolition of 'old Keebler site' at 5000 Osage.
Top
48. Fort Carson Elementary #2
Location: Fort Carson
Cost: $9.4 million
General Contractor: Nunn Construction Inc
Architect: Christiansen Reece & Partners
Start Date: April 2002
Completion Date: April 2003
New 84,000 sq ft elementary school. Construction consists of drilled
piers, grade beams, steel framing, brick veneer and curtain wall.
Top
49. African American Research
Library
Location: Denver
Cost: $9 million
General Contractor: joint venture of Turner/JA Walker
Architect: OZ Architecture/Harold Massop
Start Date: February 2002
Completion Date: April 2003
This 38,000-sq-ft, three-story structure houses a branch library for
the Five Points neighborhood, plus the African American History Research
facility.
Top
50. East Cherry Creek Valley
- Western Pump Station
Location: Highlands Ranch
Cost: $8.4 million
General Contractor: Western Summit Constructors Inc
Architect:
Start Date: August 2002
Completion Date: June 2003
The project involved construction and installation of a new water pump
station and associated appurtenances including all earthwork, sitework,
civil, yard piping, architectural, mechanical, structural, electrical,
instrumentation and control, and dewatering. Also included furnishing
and installation of a 42-in and larger discharge pipeline, 36-in suction
pipeline, various yard piping, associated isolation valves, various fittings,
metering equipment, and furnishing and instal
lation of all I & C equipment necessary for the existing Willow Water
Wells and existing above ground storage tanks.
Top
51. Rude Recreation Center
Location: Denver
Cost: $8.2 million
General Contractor: Skanska USA Building Inc
Architect: Roybal Corp
Start Date: March 2002
Completion Date: May 2003
The state-of-the-art Rude Recreation Center replaces an outdated facility
on the same inner-city site. Rude ('Rudy') will offer recreation facilities
and youth programs to an estimated 3,500 children and 1,700 adults annually.
Located on a prominent site near the new high-profile football stadium,
this 42,000-sq-ft facility makes a strong architectural statement by its
sweeping curves and its well-considered use of multiple materials including
glass block, aluminum curtain wall, brick and concrete. Inside, Rude houses
a lap and leisure pool, gymnasium, weight room, arts and crafts room,
lockers, a full kitchen and multi-use spaces.
Top
52. Memorial Briargate - Medical
Office Building 1
Location: Colorado Springs
Cost: $8.2 million
General Contractor: The Neenan Co
Architect: The Neenan Co
Start Date: August 2002
Completion Date: May 2003
The 62,000-sq-ft, multi-tenanted medical office building also has a
large radiology suite, including MRI.
Top
53. Douglas County Elementary
School #35
Location: Castle Rock
Cost: $7 million
General Contractor: Nunn Construction Inc
Architect: LKA Partners
Start Date: September 2002
Completion Date: August 2003
New 57,000-sq-ft elementary school. Construction consists of drilled
piers, grade beams, structural precast, structural steel and mechanical
crawlspace.
Top
54. Sheridan Ridge Apartments
Location: Arvada
Cost: $6.5 million
General Contractor: Palace Construction
Architect: RWN Architects
Start Date: February 2002
Completion Date: April 2003
New construction of a 65-unit, nine-building apartment complex. Handicapped
units are incorporated within two buildings, making the project highly
accessible.
Top
55. Douglas County Elementary
School #40
Location: Castle Rock
Cost: $6.5 million
General Contractor: Alliance Construction Solutions LLC
Architect: LKA Partners
Start Date: July 2002
Completion Date: August 2003
A new 60,000-sq-ft elementary school.
Top
56. Weld County North Jail Complex
Expansion
Location: Greeley
Cost: $6.3 million
General Contractor: Roche Constructors Inc
Architect: Bley Associates
Start Date: July 2002
Completion Date: October 2003
The project is a two-story consisting of a 51,500-sq-ft addition to
the existing 79,530-sq-ft facility. The addition will house 30 minimum
security cells, 31 medium security cells, 19 maximum security cells, and
a juvenile segregation area. It will house up to 239 inmates.
Top
57. Blue Spruce Town Homes
Location: Denver
Cost: $6.1 million
General Contractor: Palace Construction
Architect: Lantz Boggio
Start Date: November 2002
Completion Date: March 2003
Renovated 92-unit affordable housing community and new construction
of a community center.
Top
58. Mt Crested Butte Wastewater
Treatment Plant
Location: Crested Butte
Cost: $6 million
General Contractor: Garney Companies Inc
Architect:
Start Date: April 2002
Completion Date: April 2003
Plant expansion from .6 million gal. per day to 1.2 million gal. per
day.
Top
59. Crystal Valley Water Storage
Reservoir
Location: Castle Rock
Cost: $5.2 million
General Contractor: Garney Companies Inc
Architect:
Start Date: September 2001
Completion Date: April 2003
Four million-gal. post-tensioned concrete water tank with two pump
stations and associated piping.
Top
60. Centennial Community Church
Location: Centennial
Cost: $5.1 million
General Contractor: RAS Builders
Architect: Larson Group
Start Date: May 2002
Completion Date: February 2003
The 48,000-sq-ft addition consists of a new worship center, classrooms
and lobby hub with atrium.
Top
61. Speer Lofts
Location: Denver
Cost: $4.3 million
General Contractor: UnrealConstruction LLC
Architect: RealArchitecture Ltd
Start Date: September 2001
Completion Date: March 2003
This mixed-use residential and commercial urban infil structure has
15 loft residences and five commercial lofts.
Top
62. Denver Water Reuse Conduit
301
Location: Commerce City
Cost: $4.1 million
General Contractor: Aisa Civil Inc
Architect:
Start Date: March 2003
Completion Date: October 2003
42-in. steel reused waterline - 13,850 ln ft; 900 ln ft tunnels - 60-in.
diameter; 1400 ln ft 42-in. RCP storm drain.
Top
63. Greeley SCB Slurry Wall
(Water Storage)
Location: Greeley
Cost: $3 million
General Contractor: Hall-Irwin Construction Division
Architect: N/A
Start Date: June 2002
Completion Date: January 2003
Approximately 10,000 ln ft of slurry wall construction in Greeley.
Excavation was performed to depth of 63 ft and keyed into the bedrock.
Top
64. Parker Joint Service Facility
Location: Parker
Cost: $2.9 million
General Contractor: MW Golden Constructors
Architect: Hans Kahn Associates
Start Date: June 2002
Completion Date: August 2003
The 19,257-sq-ft addition includes eight service bays, office space,
warehouse, dispatch, garage, classrooms, remodeled tool room, fluid room
and the addition of a welding room. The project also involves of 60,000
sq ft of concrete paving for additional bus parking.
Top
65. Walgreens Plaza
Location: Thornton
Cost: $2.5 million
General Contractor: RAS Builders
Architect: Arcline - Chicago
Start Date: January 2003
Completion Date: June 2003
This project involves the construction of a 14,500-sq-ft Walgreens
on a five-acre site in Thornton.
Top
66. Roth Distributing
Location: Denver
Cost: $2.49 million
General Contractor: DSP Builders Inc
Architect: Intergroup Inc
Start Date: February 2003
Completion Date: July 2003
42,000-sq-ft tilt-up office/distribution center for Roth Distributing
including all associated site work and office tenant finish.
Top
67. Johnstown Milliken School
District Administration Building
Location: Weld County
Cost: $2.4 million
General Contractor: Hall-Irwin Construction
Architect: Thorp & Associates
Start Date: N/A
Completion Date: September 2002
Top
68. Pleasant View Sanitary
Sewer Outfall
Location: Lakewood
Cost: $2.3 million
General Contractor: Aisa Civil Inc
Architect:
Start Date: April 2002
Completion Date: May 2003
11,000 ln ft of 24-in. PVC gravity sewer; 1,300 ln ft of 42-in. tunnels.
Top
69. Ute Pass Water Treatment
Plant Phase 2 Expansion
Location: Green Mountain
Cost: $2.1 million
General Contractor: Stanek Constructors Inc
Architect:
Start Date: August 2002
Completion Date: December 2005
Construction of a new masonry building to house the owner-furnished
Trident treatment units and soda ash-free system and installation of an
above-ground diesel tank.
Top
70. Woodmen WTP Upgrade 2002
Location: Woodmen
Cost: $1.9 million
General Contractor: Stanek Constructors Inc
Architect:
Start Date: November 2002
Completion Date: March 2003
Upgrade of water filtration plant includes reservoir work one-half
mile of 16-in force main new pump station.
Top
71. Franktown Seventh Day Adventist
Church
Location: Franktown
Cost: $1.6 million
General Contractor: MW Golden Constructors
Architect: Architectural Workshop LLC
Start Date: November 2002
Completion Date: June 2003
A new church consisting of 12,750 sq ft, including classrooms, fellowship
hall, office, storage, kitchen and sanctuary along with related site development
of landscaping, parking and utilities.
Top
72. Rocky Mountain Cancer Rehabilitation
Center
Location: Greeley
Cost: $1.38 million
General Contractor: Krische Construction Inc
Architect: ABO Copeland Architecture Inc
Start Date: February 2002
Completion Date: June 2003
New construction of a 10,000-sq-ft building, subsidized by the federal
government. It is a wood/brick/stucco structure.
Top
73. Great Western Reservoir
Dam Rehabilitation
Location: Broomfield
Cost: $1.1 million
General Contractor: ASI RCC Inc
Architect:
Start Date: December 2002
Completion Date: July 2003
Clearing of 18 acres for construction of new 55,000-cu-yd spillway
and 85,000-cu-yd stability berm from onsite borrow sources, install 1,300
ln ft of 36-in. reinforced concrete pipe and three precast concrete manholes,
rehabilitation of 590 ln ft of outlet works and toe drain pipe. Replacement
of three existing outlet gates.
Top
74. Section 30 Ballfields
Location: Broomfield
Cost: $.86 million
General Contractor: Environmental Concerns Inc
Architect: Sports One Development Inc
Start Date: January 2003
Completion Date: July 2003
The project consists of constructing a concessions building with restrooms
and six picnic shelters.
Top
75. Vail Valley Medical Center
- Renovations
Location: Vail
Cost: $575,000
General Contractor: The Beck Group
Architect: HLM Design
Start Date: February 2003
Completion Date: April 2003
First floor clinic remodel; renovation and upgrade to MRI clinic; remodel
of office space to use as medical clinic space.
Top
|