1. The Children's Hospital
Aurora
$400 million
Owner: The Children's Hospital
General Contractor: Gerald H Phipps Inc; McCarthy Construction Corp
Architects: H + L Architecture; Zimmer Gunsel and Frasca Partnership
Engineers: BR+A Consulting Engineers Inc; SA Miro Inc; Bard; Cator Ruma & Associates; Rao+Athanas Consulting Engineers Inc
Start: April 2004 Finish: October 2007
A 10-story, 260-bed, 1.44-million-sq-ft hospital with administration building, medical office building, two parking structures and associated infrastructure. |
2. GCC Red Rocks Cement Plant
Pueblo
$225 million
Owner: GCC of America
General Contractor: The Industrial Co
Architect: FL Smith
Engineer: AMEC Earth & Environmental Inc
Start: March 2006 Finish: June 2007
Construction of a plant to mine limestone and process raw material into cement; includes crushers, kilns, and stockpile silos. Site development includes concrete pavement, RR spur, 2.2 miles of across roadway and a bridge. |
3. The ArraBelle at Vail Square
Vail
$165 million
Owner: Vail Resorts Development Co
General Contractor: Shaw Construction
Architect: 4240 Architecture Inc
Engineers: Cator Ruma & Associates; Monroe & Newell Engineers Inc
Start: April 2005 Finish: December 2007
Replacement of the old Lionshead gondola building and Sunbird Lodge with a 36-room Rock Resorts hotel; 71 condominiums and penthouses; luxury residences; and a Bavarian-inspired town square with a one-stop skier services center, new dining and shopping, seasonal ice skating rink and spa facilities and centralized loading and parking. |
4. COSMIX–Colorado Springs Metro Interstate Expansion
Colorado Springs
$150 million
Owner: Colorado Department of Transportation
General Contractor: Rockrimmon Constructors, a joint venture of CH2M Hill and SEMA Construction Inc
Engineers: CDOT; Rockrimmon Constructors
Start: June 2005 Finish: December 2007
Design-build project to widen I-25 from two to three lanes in each direction through Colorado Springs. Also includes improvements to several key interchanges and bridges along the corridor, plus construction of noise walls. |
5. Anschutz Inpatient Pavilion Phase II
Aurora
$143.5 million
Owner: University of Colorado Hospital
General Contractor: Haselden Construction LLC
Architect: HDR
Engineer: SA Miro Inc
Start: June 2005 Finish: August 2007
Includes a 277,000-sq-ft addition and 208,000-sq-ft build-out of the hospital’s Tower One, as well as 62,000 sq ft of renovation. |
6. Rueter-Hess Dam & Reservoir
Parker
$105 million
Owner: Parker Water & Sanitation District
General Contractor: Ames Construction; SEMA Construction Inc; Weaver General Construction;
Engineers: GEI Inc; RJH
Start: September 2004 Finish: April 2007
A nearly 17,000-acre-ft water supply reservoir with a water surface spanning 470 acres; diversion structure; and pump stations. |
7. Valor Christian High School
Highlands Ranch
$93 million
Owner: Valor Christian School
General Contractor: Saunders Construction Inc
Architect: SlaterPaull Architects
Engineers: AG Wassenaar Inc; Anderson & Hastings; DHM Group; Lund Partnership Inc; The RMH Group
Start: August 2006 Finish: October 2007
Campus includes an academic building, athletic complex, chapel, visual and performing arts complex and aquatics facility, plus a 2,000-seat football and track stadium; soccer, baseball and softball fields, and tennis courts. LEED-silver certification is expected. |
8. (tie)Prairie Gateway Infrastructure
Commerce City
$80 million
Owner: City of Commerce City and Kroenke Sports Enterprises, a public/private partnership
General Contractor: MA Mortenson Co
Architects: HOK Sport+Venue+Event; Norris Design; Daniel H. O'Brien Architecture; RNL Design
Engineer: Matrix Design Group
Start: May 2005 Finish: April 2007
Roadways and utility services feeding a 20,000-seat professional soccer stadium and a 24-field soccer complex, new Commerce City Civic Center and the potential for 200-plus acres of retail and commercial development. |
8. (tie)Leprino Office Building
Aurora
$80 million
Owner: University of Colorado Hospital
General Contractor: Haselden Construction LLC
Architect: Davis & Associates Architects PC
Engineer: BCER Engineering Inc
Start: April 2006 Finish: August 2007
A 10-story building that will include administrative offices, retail and clinical lab spaces. Two enclosed pedestrian bridges will connect the building to a 1,450-space parking garage, also part of the project. |
10. Dick’s Sporting Goods Park
Commerce City
$75 million
Owner: City of Commerce City and Kroenke Sports Enterprises, a public/private partnership
General Contractor: Turner Construction Co
Architects: HOK Sport+Venue+Event; Norris Design
Engineers: Alber Engineering; Martin Martin Inc; SSR; EDAW; Matrix Design Group; WJHW; Millennium Sports Technologies Inc; Duray/JF Duncan Industries Inc; Hydrosystems Inc; Daniel H. O’Brien Architecture
Start: 2005 Finish: April 2007
A 20,000-seat professional soccer stadium and 24-field soccer complexñthe largest soccer-specific complex in the world. |
11. Memorial Hospital East Tower Women & Children's Hospital/Emergency Services
Colorado Springs
$73.5 million
Owner: Memorial Hospital
General Contractor: PCL Construction Services Inc
Architect: Jonathan Bailey Design Inc
Engineer: CEI Consulting Engineers Inc
Start: October 2005 Finish: October 2007
A 360,000-sq-ft expansion of hospital’s main campus, featuring a seven-floor, cast-in-place structure with a radial-shaped exterior wall. |
12. Memorial Hospital North
Colorado Springs
$73.1 million
Owner: Memorial Hospital
General Contractor: JE Dunn Construction
Architects: Jonathan Baily Associates; Gallun Snow Associates
Engineers: Cator Ruma & Associates; Classic Consulting Engineers; Martin/Martin Inc
Start: October 2004 Finish: April 2007
A 208,000-sq-ft, acute-care hospital on an 82-acre site. Highlights include a three-wing radial design that offers views of the city lights, the Black Forest and mountains. |
13. Vail’s Front Door
Vail
$70.7 million
Owner: Vail Resorts Development Co
General Contractor: Hyder Construction Inc
Architect: 4240 Architecture Inc
Engineers: ABS Consultants Inc; Monroe & Newell Engineers Inc
Start: May 2006 Finish: November 2007
Includes 23,000-sq-ft Lodge at Vail spa addition, 106,000 sq ft of underground parking for 200 cars and a new skier services building. |
14. (tie) Brightwater Club Filings 1 2 & 3
Gypsum
$70 million
Owner: Clearwater Development Inc
General Contractor: TARCO Inc
Architect: Norris Design
Engineer: Vision Land Consultants Inc
Start: May 1999 Finish: Late 2007
Includes approximately nine miles of roadways and infrastructure to support a 959-acre development of this scope; domestic water distribution, sanitary sewer and storm drainage systems; and nine lakes crossing the site with return flows to Gypsum Creek. |
14. (tie) Platte Valley Medical Center
Brighton
$70 million
Owner: Platte Valley Medical Center
General Contractor: Gerald H Phipps Inc
Architects: Fentress Bradburn Architects; Walkins Hamilton Ross Architects
Engineers: Cator Ruma & Associates; Martin/Martin Inc
Start: April 2005 Finish: April 2007
A 70-bed, three-story, plus basement, hospital to replace existing facility. Includes a medical office building and central plant. |
16. Vail Plaza Hotel
Vail
$69 million
Owner: Daymer Corp
General Contractor: Shaw Construction
Architect: Zehren and Associates Inc
Engineers: M-E Engineers Inc; Monroe & Newell Engineers Inc
Start: September 2004 Finish: April 2007
A 320,000-sq-ft, 90-room hotel with 50 fractional fee units, one free-market condominium, 38 beds for employee housing, two restaurants and a bar. |
17. Orchard Town Center
Westminster
$67.8 million
Owner: Forest City
General Contractor: Roche Constructors Inc
Architects: Mulhern Group Ltd; KA Inc
Engineers: ABS Consultants Inc; Calthorpe & Associates; Design Workshop Inc; Elkus Manfredi Architects; Field Paoli; Francis Krahe & Associates; Ground Engineering Consultants; Kumar & Associates Inc; Lepetsos Group Inc; Norris Design; R2H Engine
Start: August 2005 Finish: October 2007
An open-air entertainment and lifestyle center, including site development and construction of 20 buildings. |
18. River Point at Sheridan Site Development
Sheridan
$67 million
Owner: Miller Weingarten Realty LLC
General Contractor: Adolfson & Peterson Construction
Architect: RTA Architects
Engineers: DHM Design Inc; eng 3 group; Felsburg Holt & Ullevig; Ground Engineering Consultants; HCDA Engineering Inc; V3 Consultants
Start: October 2006 Finish: December 2007
Brownfield project that converts a landfill into useable property to build retail buildings, roads and a golf course. This included multiple phases of excavation and trash removal. |
19. (tie)The Landmark
Greenwood Village
$60 million
Owner: Everist Development
General Contractor: Beck Residential
Architect: Lantz-Boggio Architects PC
Engineer: Monroe & Newell Engineers Inc.
Start: January 2007 Finish: December 2007
A 14-story, 325,000-sq-ft residential tower with parking. |
19. (tie)Ritz-Carlton Hotel & Residences
Denver
$60 million
Owner: CJS Denver Place LLC
General Contractor: MA Mortenson Co
Architect: Pahl Architecture PC
Engineers: AE Associates Inc; Denver Drywall Co; Design Force Corp; Kenny Electric Service Inc; Martin & Martin Civil Engineers & Surveyors; R J Services; Western States Fire Protection
Start: September 2006 Finish: October 2007
Full interior demolition of 19 floors of an existing hotel; new construction of 14 floors of hotel rooms and five floors of high-end residences. Expansion of bottom three floors adds 12,000 sq ft of ballroom, meeting and kitchen space. |
21. Northern Water Reclamation Facility
Colorado Springs
$57 million
Owner: Colorado Springs Utilities
General Contractor: Western Summit Constructors Inc
Architect: Michael H Collins Architects
Engineer: Montgomery-Watson-Harza
Start: June 2003 Finish: March 2007
Reclamation facility with an ultimate treatment capacity of 20 mgd, incorporating raw wastewater screening, grit removal, grit/screening truck haul facilities and an odor-controlled building. |
22. Motorplex at Century
Loveland
$55 million
Owner: McWhinney Enterprises
General Contractor:
Architect: Gensler
Engineer: Northern Engineering Service
Start: February 2005 Finish: April 2007
Master planning, graphic identity and wayfinding for 100 acres with sites for a total of 16 dealerships. |
23. Education II/Academic Office Building East
Aurora
$54 million
Owner: University of Colorado at Denver and Health Sciences Center
General Contractor: Haselden Construction LLC
Architect: Anderson Mason Dale Architects
Engineers: Martin & Martin Civil Engineers & Surveyors; SA Miro Inc; Shaffer Baucom Engineering & Consulting
Start: December 2005 Finish: August 2007
Two five-story buildings connected by a second-story bridge. Each building has two stories of education space topped by three stories of academic offices. Features include brick-and-stone masonry and metal panels, windows and sun shades. |
24. The Signature Centre at Denver West
Golden
$50 million
Owner: Aardex LLC
General Contractor: Aardex LLC
Architect: Aardex LLC
Start: March 2006 Finish: May 2007
A 186,000-sq-ft office building on track to earn LEED-platinum certification. The facility is 28% more energy efficient than traditional buildings, featuring under-floor air for individual temperature and ventilation control, indoor pollution control, reduced water consumption by more than 50%. Also, 100% of the building's power comes from wind energy. |
25. Discovery Canyon Campus
Colorado Springs
$49 million
Owner: Academy School District 20
General Contractor: Gerald H Phipps Inc
Architect: Antoine Predock Architect; MOA Architecture
Engineer: Classic Consulting; Martin/Martin Inc; M-E Engineers Inc
Start: September 2004 Finish: August 2007
A 3,000-student school featuring a design that references ancient cultures and the origins of science and math. Includes a theater, gymnasium, amphitheater and sports fields. |