12th Annual Colorado Asphalt Pavement Association
Awards
Airport
LaPlata County Airport
Contractor: Four Corners Materials
Mark Johnson, Operations Manager
Owner/Agency: Washington Group International
Steve Doak, Project Manager and Field Engineer
Improvements to the La Plata County Airport included placing
9,241 tons of HMA for new additions to the north area hangar,
taxiway, taxi lanes and access roads. Two crews, paving in
echelon, used spring-line grade-flow lines and grade breaks
at joints to assure a smooth pavement with joints that are
"difficult to find."
Commercial
Home Depot - Sterling, Colo. (tie)
Contractor: McAtee Construction Co.
John Ellis, Paving Foreman
Mike Weingardt, Grading Foreman
Owner/Agency: The Home Depot
Matt Thurling
This is the first of two Commercial parking lot projects
receiving a perfect 10, thus a tie in the ranking for Best
Overall Quality. More than 11,240 tons of HMA were placed
on the parking lot and around the new Home Depot store east
of Sterling.
Commercial
Gateway Outpost - Phase 4A (tie)
Contractor: United Companies
Fred Riffel, Paving Foreman
Owner/Agency: Gateway Construction & Design
Jason Mashburn
This project also received a perfect 10 from the awards team.
It was a fairly typical parking lot job that used excellent
construction practices. The unusual feature was that the 1,400
tons of asphalt had to be hauled approximately 70 miles from
the plant in Grand Junction to the project in Gateway. In
addition, the concrete curb and gutter was colored concrete
so extreme care had to be taken while paving against the concrete.
The paving of the parking area as well as the adjacent roadway
was very smooth with excellent joint quality.
City Street, Resurfacing
City of Grand Junction 2005 Overlay
Contractor: United Companies
Fred Riffel, Paving Foreman
Ken Dobey, Paving Foreman
Jim Elsberry, Paving Foreman
Owner/Agency: City of Grand Junction
Dave Van Wagoner, Supervisor
This project paved downtown Grand Junction streets and intersections.
The city and the contractor decided that to pave one of the
busiest intersections in town, Sunday would be the best day
to close First Street and detour traffic around it. The contractor
decided to bring in three paving crews and pave in echelon
to minimize the road closure and have hot/high quality joints.
The process gave the city a good product and the public inconvenience
was kept to a minimum. More than 3,000 tons of HMA were placed
on this job.
City Street, New or Reconstruction
Centerra East - Phase 1 (Infrastructure)
Contractor: Coulson Excavating Co.
Randy Manlick, Grading Foreman Paving
Charlie Knight, Superintendent
Owner/Agency: Empire Management Inc.
Dwayne Walker, President
Scoring a perfect 10, this project placed all new pavement
for the infrastructure at The Promenade Shops at Centerra
near I-25 and U.S. 34. More than 36,000 tons of HMA was placed
on the streets surrounding the shops as well as for the widening
of U.S. 34. The project was completed in 197 days, including
three nights used for widening U.S. 34.
Night Paving
120th Ave., Federal to Melody Drive
Contractor: Brannan Sand & Gravel Co.
Kevin Flowers,Project Manager
Jimmy Nalow, Project Superintendent
Owner/Agency: Colorado Department of Transportation
Dennis Toller, Project Engineer
John Schwab, Resident Engineer
Only 70 calendar days were used to place 13,400 tons of HMA
along 120th Ave in Northglenn. This night paving project included
a two-in. mill with two-in. overlay, resulting in a very smooth/quiet
ride.
Preventive Maintenance
S.H. 36 Chip Seal North of Boulder
Contractor: A-1 Chip Seal
Corey Martenson, Operations Manager
Paul Salazar, Operations Manager
Owner/Agency: Colorado Department of Transportation Region
4
Bob Hays, Project Manager
Dan Marucci, Assistant Project Manager
Rick Jensen Project Inspector
Another CAPA Award-nominated project that scored a perfect
10, this job placed a chip seal along U.S. 36, north of Boulder.
What impressed the awards team the most on this job was the
uniformity of the final surface and no apparent loss of chip
after construction. This project was nominated by SEM Materials.
Project Delivery
Downtown Pearl Street Mall Loop
Contractor: Lafarge West Inc.
Scott Young, Construction Manager
Owner/Agency: City of Boulder, Public Works Department
Alex May, Transportation Project Manager
Doug Smith, Engineering Technician
The aggressive and mostly night-time construction operations
virtually eliminated most of the impacts associated with the
work. The completion of the resurfacing portion, applying
2,800 tons of HMA in 24 calendar days, was impressive considering
the high-density urban conditions and timing constraints requested
by the downtown interests.
Rural Highway Resurfacing
U.S. 36, Lyons to Estes Park
Contractor: Coulson Excavating Co.
Eldon Hessler, Project Superintendent
Terry Reusink, Paving Foreman
Owner/Agency: Colorado Department of Transportation, Region
4
Gerald Fielding, Project Engineer
James Zufall, Resident Engineer
Mountainous paving conditions, echelon paving in widened areas
and pull-offs, as well as the high volume of traffic supported
the award team's decision to reward this 20-mile-long project
south of Estes Park. Nearly 93,000 tons of HMA were placed
in two lifts. Paving was completed in 93 days under restricted
hours while maintaining traffic. The project included street
improvements in the Town of Lyons as well as the U.S. 36 overlay.
Honorable Mention
Rural Highway Resurfacing
Left Hand Canyon Drive
Contractor: Asphalt Paving Co.
Owner/Agency: Boulder County Transportation
This project placed 10,000 tons of HMA in 35 working days
on a winding mountain roadway. The existing roadway was 24
ft and widened three ft on each side to accommodate bike lanes.
This process included shifting the center lane of the existing
roadway to widen it. During construction, the roadway was
open to motorist and bicycle traffic.
Honorable Mention
Rural Highway Resurfacing
Happy Canyon Overlay Project
Contractor: Lafarge
Owner/Agency: Douglas County Department of Public Works
Using 3,312 tons of HMA, this county road was paved over the
course of two consecutive days. Traffic control was of particular
importance and was handled by restricting traffic to one direction
at a time. The timing of the project was also important to
have the road finished before a major golf event.
Rural Highway, New or Reconstruction
U.S. 24, Constitution to Garrett
Contractor: Rocky Mountain Materials & Asphalt Inc.
Doug Coffee, Project Superintendent
Eric Hodson, Project Manager
Owner/Agency: Colorado Department of Transportation Region
2
Paul Reinsma, Project Engineer
Mark Andrew, Resident Engineer
42,405 tons of HMA were placed, along with the requirement
of the contractor to include a 10-year warranty on the performance
of the project. The contractor took extra care to ensure a
high-quality grade on which to place three lifts of HMA.
Smoothest Pavement, New or Reconstruction
U.S. 24, Constitution to Garrett
Contractor: Rocky Mountain Materials & Asphalt Inc.
Jason Dody, Paving Superintendent
Gabe Leanos, Paving Superintendent
Owner/Agency: Colorado Department of Transportation Region
2
Paul Reinsma, Project Engineer
Mark Andrew, Resident Engineer
Urban Highway, Resurfacing
Federal Boulevard, Belleview to Jewell
Contractor: Aggregate Industries
Jerry Meir, General Superintendent
Jerry Severidt, Project Superintendent
Tony Fernandez, Paving Foreman
Owner/Agency: Colorado Department of Transportation, Region
6
Kevin Hsu, Project Engineer
Ken Nakao, Project Designer
Located along a busy commercial arterial route in southwest
Denver, this urban project had over 100 manholes, water valves
and multiple busy intersections, which were paved on Sunday
mornings to minimize the impact to the public. Over 24,000
tons of HMA were placed as part of this mill-and-fill project.
Urban Highway, New or Reconstruction
Powers Blvd., Briargate to S.H. 83
Contractor: Schmidt Construction
Joe Maher, Operations Manager
Jim Stewart, Project Supervisor
Geno Chavez, Paving Superintendent
Owner/Agency: Colorado Department of Transportation Region
2
Davis Smith, Resident Engineer
Dale Weaver, Powers Corridor
Over 38,000 tons of HMA was placed, which included the two-in.
SMA surface course. This project is part of a long-term study
to determine service live of asphalt versus concrete. The
contractor spared no expense on personnel and equipment to
deliver a superior product to compete against the adjacent
concrete pavement project.
Smoothest Pavement & Crew Resurfacing
I-70, Bakerville - East
Contractor: Kiewit Western Co.
Tylor Bottorff, Project Engineer
Owner/Agency: Colorado Department of Transportation Region
1
Jim Vandyne, Project Engineer
Anthony DeVito, Resident Engineer
Approximately 47,000 tons of HMA were placed using a reverse
sequence paving from the outside shoulder to inside median
to enhance smoothness. This all-night paving project took
place in a mountain environment with high traffic. The contractor
was extra cautious to minimize public impact and produce a
safe project environment.
Click here for